A04301V Churchill Bridge Layer
Taking just 1.5 minutes to deploy, the Tank Bridge No.2 provided a Class 60 tracked load and a Class 40 wheeled load over a 30ft gap. The bridge was in one piece and mounted on the turretless tank. The launching arm was attached by a pivoting arm mechanism with rollers to the front of the tank, the other end of the arm being attached to the centre of the bridge. The bridge remained horizontal as it was raised and then lowered by the pivot arm across the gap.
Safety Information
Not suitable for children under 8 years. For use under adult supervision. Read the instructions before use, follow them for reference. Humbrol Poly Cement contains butyl acetate. May casue drowsiness or dizziness. Avoid breathing vapours . Use only outdoors or in a well ventitlated area. IF INHALED: Remove person to fresh air and keep comfortable for breathing. Call a doctor if you do feel unwell. Dispose of contents/container in accordance with local regulations. Read label before use.
spec
length-15cm
height-3.28cm
width-4.9cm
number of parts-129
scale-1/76
skill level-2
paint scheme
A04301V Churchill Bridge Layer
no53 gunmetal-metallic
no113 rust-matt
Safety Information
Not suitable for children under 8 years. For use under adult supervision. Read the instructions before use, follow them for reference. Humbrol Poly Cement contains butyl acetate. May casue drowsiness or dizziness. Avoid breathing vapours . Use only outdoors or in a well ventitlated area. IF INHALED: Remove person to fresh air and keep comfortable for breathing. Call a doctor if you do feel unwell. Dispose of contents/container in accordance with local regulations. Read label before use.
